NHBC – Zurich – Premier – Cavity Rail System

This stunning new school development has been designed to incorporate sustainable materials. Jubizol MP was specified because this particular system is installed using mineral fibre insulation and our breathable Silicate through colour render. This system also incorporates the NHBC, Zurich and Premier cavity which eradicates the risk of condensation.